Short-Term Revamping Technology for Large Blast Furnace
FUJITA Masao   TOKUDA Keiichiro   KOJIMA Hirotaka
  Abstract
  To revamp a blast furnace(BF) is required about every 15 years, and revamp duration by a conventional method is around 130 days. JFE Steel has developed a new revamping method, so called “Large Block Ring Construction Method.” By employing the method, the revamp duration was remarkably reduced to a half of a conventional one. A furnace body (10000t) was segmented into blocks of 10 t to 20 t weight during dismantling and installation in conventional method. Blocks by the Large Block Ring Constitution Method weigh over 2000 t a piece. Consequently, the revamp duration of No. 6 BF at East Japan Works(Chiba) in 1998 was only 62 days, which was the world shortest record of revamp duration. The method was also successfully adopted to No. 5 BF at West Japan works (Fukuyama) in 2005, and established a new world record of 58 days.
  
  Full Pages
    Short-Term Revamping Technology for Large Blast Furnace    [ PDF 9P / 676KB ]
  

You need Adobe® Acrobat® Reader software of version 5.0 or above to view the file. Please click the icon below to download the free Acrobat Reader.
Adobe

 index
  
Company Profile News Releases Products Environmental Activities R&D Return to Top Terms and Conditions