| The JFE Group
(JFE Engineering, JFE Steel, and JFE R&D)
has developed a QCIB (quick closing integral
bridge) Method, which enables quick, safe,
economical construction of grade separation
bridges at intersections in urban areas by
designing the entire bridge, including the
foundation, as a bridge system. The QCIB Method
consists of several established core technologies
on fundamental design and construction. This
paper presents an outline of the QCIB Method
and core technologies. |