KAWASAKI STEEL TECHNICAL REPORT
No.21 ( November 1989 )
Civil and Architectural Engineering
‘‘‘‘‘‘‘‘‘‘‘‘‘‘‘‘‘‘‘‘

Construction of Steel Plants and Coastal Engineering Projects

Masao Nagano, Toyokazu Sakaki, Tamotsu Kimura, Katsuaki Okamoto, Kei Wada, Keisuke Shiota
Synopsis :
Kawasaki Steel Corporation has developed Chiba and Mizushima integrated steelworks on reclaimed lands. The construction of these works was not limited to the construction of plants but extended to the total development of the water front area near the Chiba and Mizushima Works. The surrounding region and the construction history of the two steelworks are described. The developed technologies, which are useful for any water front construction, are introduced, such as the interlocked steel pipe pile method, walled steel pipe pile well method, prefabricated corrugated cell bulkhead, underwater junction method, and fast offshore pile driving system.